A typical home EV charger installation starts with a survey of your supply and parking area, then a dedicated circuit is run from the consumer unit to the charger, the earthing arrangement is dealt with, and the installation is tested, certified and notified under Part P. Most of the work happens outside and at the consumer unit, and the charger is commissioned and demonstrated before the electrician leaves.
Knowing the stages helps you prepare, ask the right questions and understand the paperwork you should receive.
Step 1: the survey
The survey is where the installation is designed. A qualified electrician will usually look at:
- The parking space and where the charger can be mounted
- The route a cable can take from the consumer unit to the charger
- The type and condition of the consumer unit
- The main fuse rating and the maximum demand on the supply
- The earthing arrangement provided by the network
- Wi Fi or mobile signal at the charger location
- Any solar, battery storage or heat pump already fitted
Some installers ask for photos first, but a physical survey is often needed for anything other than a straightforward job.
Step 2: choosing the charger and location
The location should let the cable reach the car's charging port comfortably without crossing paths or the public pavement. It should be protected from impact by vehicles and easy to reach. Whether you choose a tethered or untethered unit is covered in our tethered vs untethered guide, and power ratings are explained in 7kW vs 22kW EV chargers.
Step 3: notifying the network operator
The installer usually needs to tell the distribution network operator about a new home chargepoint, and in some cases must apply before installation, depending on the total demand at the property. This is a routine step handled by the installer, but it can affect timings if the network needs to review the supply.
Step 4: the cable route and circuit
On the day, the electrician isolates the supply safely and runs a new dedicated circuit from the consumer unit to the charger. The cable may run through walls, along the outside of the building in suitable protection, or underground if the charger is away from the house. The method depends on your property and what you agree at the survey.
The circuit needs suitable protection at the consumer unit, typically including an RCD of the right type. If the existing consumer unit is old or has no spare capacity, the electrician may recommend an upgrade or a separate small enclosure. Our consumer unit upgrade guide explains when that is needed.
Step 5: earthing
Earthing is one of the most important parts of an EV installation. Many UK homes have a PME earthing arrangement, and BS 7671 has specific requirements for EV chargers supplied from PME, because a fault on the network could otherwise make the car body dangerous. The solution may be a charger with built in protection that meets the regulations, or a separate earth electrode. Our EV charger earthing and PME guide explains this in plain terms.
Step 6: mounting and connection
The charger is fixed to the wall or a post, the circuit is connected, and any load management sensors or solar clamps are installed. Sealing and cable entry are finished to keep weather out.
Step 7: testing and commissioning
Before the charger is used, the electrician tests the new circuit. This normally includes continuity, insulation resistance, polarity, earth fault loop impedance and RCD operation. The charger is then commissioned: it is connected to Wi Fi or data, set up in the app and checked with a charging session where possible.
Step 8: certification and notification
You should receive an Electrical Installation Certificate for the new circuit. Because chargepoint installation is notifiable work in England, a registered electrician will also notify it through their competent person scheme so that a Building Regulations compliance certificate is issued. Keep these documents with your property paperwork. Our Part P and electrical certificates guide explains the difference between them.
Step 9: handover
The installer should show you how to use the charger, the app and any schedules, where the circuit protection is in the consumer unit, and what to do if the charger shows a fault. Ask for the manufacturer's documentation and warranty details.
How to prepare
- Clear access to the consumer unit and the charger location.
- Make sure someone is home to agree the final position.
- Have your Wi Fi name and password ready.
- Expect the power to be off for part of the visit.
- Mention any planned changes, such as a heat pump or a new car.
What can change on the day
Occasionally the electrician finds something that was not visible at the survey, such as an existing fault, damaged cable or earthing that does not meet current standards. A good installer will explain what they have found and discuss options with you before doing any extra work.
Next steps
You can find out about our home charger installations on our EV charger installation page and our EV charger installer page. When you are ready, contact us to arrange a survey and quotation.
Why this should not be a DIY job
Installing an EV charger involves a high powered circuit that runs for hours at a time, outdoor equipment and specific earthing requirements. Mistakes can cause overheating, electric shock or fire. The work must be carried out by a competent, registered electrician who can test, certify and notify it. Self installation also risks invalidating manufacturer warranties and can cause problems when you sell the property.
Frequently asked questions
How long does an EV charger installation take?
A straightforward installation is often completed in a single visit, but time depends on the cable route, consumer unit and earthing. Your installer should give you an idea at the survey.
Will my power be switched off?
Yes, for part of the visit while the new circuit is connected safely at the consumer unit. The electrician should tell you when this will happen.
Do I need to tell my network operator?
The installer usually handles notifying the distribution network operator, and in some cases must apply before installation depending on the demand at the property.
What paperwork should I get?
An Electrical Installation Certificate for the new circuit and a Building Regulations compliance certificate through the electrician's competent person scheme, plus the charger documentation.
Might I need a new consumer unit?
Sometimes. If the existing board is old, has no spare way or lacks suitable protection, the electrician may recommend an upgrade or a separate enclosure.
Sources
- GOV.UK, Approved Document P: electrical safety (dwellings)https://www.gov.uk/government/publications/electrical-safety-approved-document-p
- IET, BS 7671 Wiring Regulationshttps://electrical.theiet.org/bs-7671/
- GOV.UK, Electric vehicle chargepoint grantshttps://www.gov.uk/guidance/electric-vehicle-chargepoint-grants